Treatment Facilities
Current Projects include:
- Twin Oaks Valley Water Treatment Facility
This is a design build facility that will produce 100 mgs a day of
finished drinking water from San Diego County water authority. SCI is
placing 20,000 cubic yards of structural concrete on this project as a
member of the CH2M Hill design team subcontract.
- Hawks Prairie Water Treatment Facility (Lacey Washington)
Hawks Prairie Water Treatment Facility for the City of Lacey is being constructed over an existing water well
needing treatment utilizing GAC (Granular Activated Carbon) Filters along with Greensand Filter vessels. Water
from the well will run through these filters and go to the City't reservoir supply system. A seperate building
will create a Booster supply to add to the pressure and capacity.